Laminate Project, Toronto

We removed the old laminate and shoe mouldings on the floor. We installed under-pad and 12 mm laminate. After, we installed new mouldings. The hallway has many doors even though the laminate was perfectly installed. Transition wasn’t used between the rooms and the hallway.